New Dry Fertilizer Blending Facility

Ailsa Craig, ON

 

Project: Hensall District Cooperative
Location: Ailsa Craig, ON
Date: April 1, 2012

Distributor: Green Lea Ag Center

Hensall District is a very progress, industry leading coop in southern Ontario.  30 years ago or so they installed a 90 Ton blend tower at their old location in the town of Ailsa Craig.  through last fall they ran that tower. This past winter/spring they installed a new fertilizer plant and 150 ton blend tower at their new location outside of town.

Receiving consists of a truck receiving drag conveyor, elevator leg and over bin shuttle conveyor with 150 TPH capacity.

A 150 TPH reclaim system consisting of an infloor drag conveyor and elevator leg that feeds a 150 ton blend tower with (1) 10 ton vertical blender for high capacity blending and load-out.